Research and Development

R&D department plans, develop and improvise motor designs
Analysis, Research, Innovation, Improvement

Research and Development

Kinmore involves more than 40 experienced R&D engineers with 10% sales as a budget each year. In the R&D department, we have lots of high-precision equipment as well as the latest design software like Autocad, Proe, Solidwork and so on.


New product development plan

In order to ensure that the new DC motor and gear motor can be delivered to customers with maximum satisfaction,Kinmore sales engineers should get and understand completely customers’ products original requirements which include:
A. DC motor/ Gear motor dimensions and connection installation dimensions.
B.Electrical performance data: Vol. Working Speed, Current,and torque. Stall Current and Torque. Work duty, working environment conditions, Noise, Life expectancy etc.
C. The markets regulation and laws (option) i.e.UL,CE,RoHS,REACH etc
D. Other requirements,i.e. costs targets

Kinmore design team provide feasibility analysis report to customers that include:
A.product development lead time, product costs and molds costs.
B. Design risk evaluation

Kinmore design engineers ustilize FMEA,VE etc.advanced design technology, and the latest analysis system like MEA Motor Performance Analyzing System, Starting Torque Tester, Gearhead design software to design a product. The involved design processes and documents are following:
A.Gathering all original requirements from customers set up Input documents lists
B.Functional verification DC motor / gear motor 2D/3D drawings
C.Make specification and manuals
D.Evaluate the necessary for apply patent

Kinmore design engineers ustilize FMEA,VE etc.advanced design technology, and the latest analysis system like MEA Motor Performance Analyzing System, Starting Torque Tester, Gearhead design software to design a product. The involved design processes and documents are following:
A.Gathering all original requirements from customers set up Input documents lists
B.Functional verification DC motor / gear motor 2D/3D drawings
C.Make specification and manuals
D.Evaluate the necessary for apply patent

Design verification
A.Design input / output review
B.Pilot test.:To test samples full performance and validate all of data meet specification’s needs.
C.Evaluate the necessary for apply patent

Development plan
A.Development schedule,the updated implementation are shared with customers on time.
B.Molds development, Mold costs checking, Mold annotation
C.Production process preparation, new equipment and facility confirmation,Productivity evaluation
D.Making samples and pilot run. Review the know how capability, personnel organization

Customer approval
Customer test and validate the samples and pilot run. If not approved, we’ll make improved samples and until the samples are approved by customer.

Contact Us

  • 1304 Nangang Business Building NO.1428 Qianhai Road Shenzhen 518052 China.
  • +86-0755-21677419
  • +86-0755-26470091
  • Email: kinmore@kinmoremotor.cn

©2009-2018 Shenzhen Kinmore Motor Co., Ltd. All Rights Reserved. ICP:17128224