Model No. :

Main Features

Remarks

Dimensions Drawing of




Customizable Design:   

Technical Data



FAQ

Q: Could you tell me the lead time for samples and order?
A: For normal dc motor samples, the lead time is around 10~15days and for gear motor samples, it'll be 15~20days. If there is special requirements like extended shaft, special reduction ratio, lead time will be longer. For orders, the standard lead time is 35days and this time can be shorter or longer based on different model, period and quantity.
Q: Is there a detailed lifetime for your motors?
A: A: I am afraid not. The lifetime varies a lot for different models, materials and the operating conditions like temp., humidity, duty cycle, input power, and how the motor or gear motor is coupled to the load etc. And the lifetime we normally mentioned is the time when the motor rotate without any stop and the current, speed and torque change is within +/-30% of the initial value. If you can specify the detailed requirements and working condition, we'll make our evaluation to see which one will be suitable to meet your needs.
Read more FAQs

Similar Products

Inquiry of

Mr.
Ms.

Details

Submit

Contact Us

  • 1304 Nangang Business Building NO.1428 Qianhai Road Shenzhen 518052 China.
  • +86-0755-21677419
  • +86-0755-26470091
  • Email: kinmore@kinmoremotor.cn

©2009-2018 Shenzhen Kinmore Motor Co., Ltd. All Rights Reserved. ICP:17128224

Inquiry of